Versatile Building Products Deck and Garage Coatings
Click Here to find a local distributor
Click here to obtain more information about Versatile Building Products
Click Here for contact information
Click here to return to Versatile Building Products Home Page

Roll On Rock® System 4h
MVE Resistant Epoxy Vinyl Chip Garage Floor Coating

Roll On Rock® 4h Hybrid Polyurea Vinyl Flake Concrete Garage Floor Coating

Roll On Rock® System 4h Flash Video



Roll On Rock® should not be confused with the cheap problematic garagecoatings available from the big box stores.

Epoxy Polyurea Urethane Hybrid Flake Garage Floor Coating
Hot Tires Will Not Make It Peel, Period!

The Roll On Rock® System 4h is a 3 step hybrid coating system designed to give the applicator an extremely high performance coating that can be installed very quickly. The customer will love the fact that they can walk on it the same day it was coated, as soon as 2 hours after it is dry. Roll On Rock™ System 4h utilizes 5205, a hybrid penetrative primer which wicks into the concrete to provide a fantastic bond. 5205 will dry within 30 minutes yet it has a potlife of over an hour! This makes it very user friendly. When dry the 5210 Hybrid bodycoat is applied and the flakes are broadcast onto it within 20 minutes (**most other similar systems need to be flaked within 3-4 minutes). The 5210 and flake can be scraped in about an hour yet the potlife of the 5210 is over 60 minutes. Once again the applicator will not have to fight the material. When scraped, a coat of 5073 Polyurea completes the install. The Polyurea has well over 30 minutes potlife and it can be walked on in 2-3 hours when temperatures are above 70 degrees. The completed Roll On Rock™ System 4h installation will be between 25 to 30 mils and have a gloss like no other (**most other similar system are 12-15 mils and still cost more than our 25-30 mils). Your customer can remove the items from their garage in the morning and then replace them in the evening. You now only need to go to the job one time which doubles your production. You also can double your coverage area since only one trip will be needed. The materials cost (aprox $1.30 sq ft) 25-30% more than our 2 step system (with same 5073 topcoat) however you are getting an additional primer coat which adds build and ease of chipping (you don't have to worry about the coating sucking out and not holding the chip). The extra 35-45 cents a sq ft for materials is much less than the additional cost associated with a second trip which would be 3-4 hours including travel time, wear and tear, production time, etc. And when you figure that the second trip can now be spent doing a new job or selling another job it becomes a simple decision.

All Roll On Rock® System 4h components are also compliant with the new strict SCAQMD rules that become law July 2006. See the chart below for the pros and cons for each system. This range of floor coatings designed specifically for the garage floor is just one more reason why VBP is the leader in the garage floor and industrial coating industry.

Click here to see how our Polyurea beat the Flexmar Polyaspartic in an independent test

Features & Advantages

Installs in as Little as 3 Hours
 Walk On It as Soon as 2 Hours After Installation
 Park On It as Soon as the Next Day
 25- 30 Mils Thick
 OK For Exterior UV Exposure
 Unusual Extra Long Potlife for Such Fast Drying Material
 Hot Tire Resistant
Looks Like Granite
Easy to clean
 Doubles Your Production Output and Job Coverage Area
Uses the Mirror Like Gloss Polyurea 5073 Topcoat
 Most Abrasion Resistant System We Have
 Expect the Gloss to Shine For Years
Can Withstand up to 5 LBS M.V.E. Without Peeling

  vapor blocking epoxy garage floor coating   Roll On ROck Hybrid Polyurea Urethane Garage Floor Coating
Roll On Rock Hybrid Polyurea Urethene Garage Floor Coating

Pros and Cons, Which System is Right for Me?
The 4 Standard Roll On Rock® Systems Offered by Versatile Building Products, Inc.

All 3 systems perform well and offer the same appearance when completed. The main difference is the amount of MVE transmission (moisture vapor emissions)that they can withstand before blowing off the surface and the ease of application and coats required. Use the data below to make a decision on what works best for your project. Then review the installation guides to be familiar with how they are applied.

Epoxy Basecoat Data System 1 System 2 System 3 System 4
(Professional Use Only)
Epoxy Basecoat Used 4010-4020 Waterbased Series 4195 95% Solids Series 4150 100% Solids Series Hybrid 5210 Scrape in 1 Hour
Easy to apply Easy Easy Moderate Yes
Primer Needed Yes, Coatable in 1 hour No, Self Priming No, Self Priming Yes, Hybrid 5205 dry in 30 min
Odor Very Mild Very Mild Very Mild Moderate
Flammable No No No Yes
Clean Up With Water Solvent Solvent Solvent
Basecoat Pot Life 1 Hour 3 hours 1 hour Over 60 Minutes for both
Chipping Window 15-30 Minutes after Applying 15-45 Minutes after Applying 44-60 Minutes after Applying Over 20 Minutes after applying
Acceptable MVE 8 LBS 10 LBS 12 LBS 6 LBS
VOC 6 VOC (primer) & 49 VOC 29 VOC 28 VOC Under 10
Pot Life In Extreme Heat Great Moderate Moderate Over 60 Minutes
Viscosity Great Great Good Great
Helps Reduce Global Warming Yes, Below 50 VOC Yes, Below 30 VOC Yes, Below 30 VOC Yes, Below 10 VOC
 
Clear Topcoat Choices Solventborne 5300 Series Waterbased CRU 5400 Polyurea 5000 Polyurea 5073
VOC 100-400 45/Gloss 16/Matte 9 9
Odor Bad Solvent Smell Pleasant Pleasant Mild Odor, causes light headedness
Flammable Yes No No Yes
Gloss Good Good Great Great
Matte Finish No Yes No No
% Solids Content 53 61/ Gloss 63/ Matte 100 High
Exterior Use Yes Yes Yes Yes
Will It Yellow No No No No
Hot Tire Resistant Yes Yes Yes Yes
Resistance to Household Chemicals Great Great Great Great
Clean Up With Solvent Water Solvent Solvent
Easy To Apply Moderate Yes, Very Moderate to Difficult Yes
Pot Life In Extreme Heat Moderate Great Moderate Good
Viscosity Good Great Good Great
Dry Film Build When Applied at 250 per gal 3 Mils 3.5 Mils 6 Mils 4.5
Helps Reduce Global Warming No, Very High VOC Yes, below 50 VOC Yes, below 10 VOC Yes, below 10 VOC
Literature
Install Guides
5073 Installation Tips Guide
MSDS (see individual components as needed per install guide)
Installation Videos
Go out on a job with a contractor who does 10-15 garage floors a week. You will see each step of the process done over several different jobs in 1 day.

Roll On Rock® is the #1 choice for professionals that make it a full time business installing garage floor coatings.
Roll On Rock® Will Not Peel from Hot Tires!

Customer For Life Link

See our FAQ page for more tips

©2005 Versatile Building Products. All rights reserved.